24.05.2024
MiR equipped with new VIVACE! Even back in the 1950s, when it was still known as Städtische Bühnen Gelsenkirchen, the Musiktheater im Revier (MiR) was one of the most important stages in the German-speaking countries. In February 2024, the VIVACE system in the main auditorium was equipped with new hardware and software and recalibrated from scratch.
02.12.2023
In the heart of the Norwegian ski area Hemsedal Skicenter, the Skigaarden was opened as a new attraction for ski and mountain enthusiasts at the end of 2023. According to the motto “Eat – Drink – Stay”, a residence meeting the highest culinary, social, and acoustic standards was built with uncompromising quality and attention to detail.
16.09.2023
"The Church of Farnes is finally complete after 36 years." Pastor Olav Nese – As part of the renovation of Farnes Church, the previously used electronic room acoustic system, VRAS system, has been replaced with a modern VICELLO system from Müller-BBM Acoustic Solutions GmbH to achieve an extension of the reverberation time to up to 6 seconds. The system was installed and calibrated by our Scandinavian distributor Jo Wang (Panpot AS).
16.07.2023
The Dailes Theatre is the largest professional theatre in the Baltic States with a history and traditions dating back over a century. The artistic vision of its founder, the legendary director Eduards Smiļģis, has shaped the theater’s style for more than 40 years. Today, this tradition continues, with new innovations and high aesthetic standards determining the artistic direction of the theatre.
08.01.2022
The new 115,000 m² Shanghai Library East is located in Pudong District - the area of the city known for its iconic skyline, and sits immediately next to Century Park –the largest park in the city spread over 140 hectares.
01.01.2022
Right in the centre of the city of Skellefteå, just below the Arctic Circle in northern Sweden, culture is getting a new home - at the Sara Cultural Centre.
28.12.2021
The corona related distancing regulations for choristers required an unusual solution to make the Bayreuth Festspielhaus performances possible. One half of the choir acted scenically on stage while the vocals of the remaining, remotely singing choir was recorded. Müller-BBM Acoustic Solutions GmbH, among others, was responsible for the elaborate realisation of the electro-acoustic transmission.
12.11.2021
Tolga Municipality is a small municipality with about 1,600 inhabitants and is located in the north of Innlandet Province. In the heart of Tolga, there was a community centre, which had been a popular meeting point for generations.
11.11.2021
The former "Ostseehalle" or also "Sparkassen-Arena" is today one of the largest halls in Germany and is thus the venue for a wide variety of events.
16.09.2021
Together with our Dutch distributor, Heuff Sound & Vision Import, we successfully completed our first Dutch project: the AFAS Experience Center.
30.08.2021
A big sigh of relief - as of 01 July, major events in Austria are allowed again almost without restrictions with full occupancy of the seats. This was great news for the 75th Bregenz Festival which could start as planned from 22 July.
24.08.2021
The 36th Davos Festival took place from 07 to 21 August 2021 - in keeping with the zeitgeist, this year's event was held under the motto "Aequalis", which comes from Latin and means "equal".
23.07.2021
In the south of the province Fylke Vestfold og Telemark lies the Norwegian municipality of Bamble. In June of this year the local multipurpose hall was equipped with a VIVACE system.
22.07.2021
After months of break due to Corona, all classical music lovers could rejoice last weekend. On July 9 and 10, 2021, the Odeonsplatz once again became Munich's largest classical concert hall.
03.03.2021
True to the motto "A new piece of Berlin", the Humboldt Forum was digitally opened in December 2020. Due to the pandemic situation, visitors unfortunately cannot be welcomed on site at the moment, but there already are unique insights: live streamed and guided online.
31.01.2021
In the middle of the independent city of Kempten the historic municipal theatre is located. At the beginning of the year it was replaced and adjusted to the theatre by the electronic room acoustic system VIVACE.
19.11.2020
Like most small performing arts venues, there’s huge variety in the styles of acts it hosts.
29.09.2020
Thanks to numerous corona measures, the concert of the Würth Philharmonic Orchestra could take place as a replacement for the cancelled summer concert.